Story so far…

The concept for the Green Heart was conceived in 2011. At that time, the University was investigating how to redevelop the institution’s library services to enhance modern education and teaching. Lengthy consideration was given to options to redevelop and re-purpose the existing library at the centre of the Edgbaston campus. But, costs aside, there were limitations to how much could be done to improve and expand the building itself, and the library’s infrastructure was rapidly deteriorating; meaning it required 24-hour running and maintenance.

It was agreed that the University’s students, employees and researchers deserved a state-of-the-art facility fit for the 21st Century and beyond. The new Library was completed in September 2016. As a result, the former library would be removed, meaning that opening up the centre of campus once again became a very real possibility; the Green Heart was born.

X:3334 UoB Green HeartBIM3-PublishedCURRENTCN - Coordinati

Building a new space centred around you

The project is led by a University of Birmingham task group which brings together Estates, the Guild, External Relations, HAS, Finance and IT; with academic representation. We are also working in collaboration with award-winning designers including: Churchman Landscape Architects, lighting specialists Speirs + Major, Associated Architects, Arup structural and civil engineers and Couch Perry Wilkes services engineers.

Building the Green Heart has always driven by a desire to build a new space centred around our students, staff and local community. From May 2016, the University undertook extensive consultations in collaboration with Nomad RDC Ltd. These were undertaken to thoroughly understand the needs of our stakeholders and ensure that the Green Heart included what they wanted. These suggestions were explored and incorporated into the Green Heart vision, and those Green Heart Consultation Results were released in March 2017 as project work gathered pace.

From July 2017, work began to create the Green Heart, beginning with the demolition of the former library. The former library is now being taken down following the summer exam period, and should be completely dismantled before the start of term in autumn. The first steps towards creating the Green Heart will take place over two phases which will transform University Square from July 2017 to November 2017, and then November 2017 to March 2018. North Car Park will close permanently after 13 July.

The planned schedule for the completion of the Green Heart is 2019. Watch the journey unfold on our webcam!

Be part of the Green Heart journey here.